Camp Nor'wester Office
A new off-grid office for Camp Nor'wester, built on an outlying island in the San Juan Islands with limited access. The new office is designed to be an off-grid, self-sufficient structure with a battery back-up system, photo-voltaic array and rain water catchment. The new office design also utilizes passive solar strategies to maximize comfortable day-lighting throughout the day and minimize heating demands.
Location: Johns Island, WA
Proposed Size: 2400
Contractor + Design/Build Partner: Ascent Building Company
Structural Engineer: Harriott Valentine